英文簡(jiǎn)歷表格模板
時(shí)間:
成康767由 分享
英文簡(jiǎn)歷表格模板
簡(jiǎn)歷作為一種特殊的應(yīng)用文體,是求職和招聘中間的一個(gè)重要媒介,在個(gè)人的職業(yè)發(fā)展道路和企業(yè)招聘發(fā)揮著重要的作用。以下是學(xué)習(xí)啦小編整理的英文簡(jiǎn)歷表格模板,以供大家參考。英文簡(jiǎn)歷表格模板一:
Name: sex don't: male |
Date of birth: 9-14 marital status: confidential |
2010.07 XXX group civil engineer |
Job description: the project owner representative. Responsible for the entire construction site of the project quality and project acceptance, engineering technical treatment, archives acceptance and hand over. At the same time as the company a stage 4 to 8 # project manager, be responsible for the routine work of the project department, is responsible for organizing the process, division, the completion inspection and acceptance, coordinates the process. Project experience |
2011.02 to 2012.05, the first ChengLiJing second phase 4, 7, 8 # floor, development tools:, hardware environment, software environment: |
Project description: the project construction area of 32000 square meters. Frame, the brick mixes a structure. Building. |
Responsibility description: in this project as a project executive manager and technical project manager, presided over the routine work of the project, the project department is responsible for with party a, supervision, design, quality supervision departments and service company's coordination. Prepare the construction organization design and special construction plan, the construction of the technical question to put forward the treatment scheme. Your each working procedure for inspection acceptance, host sub-item project acceptance, the construction process of safety, quality, safety civilization construction for tracking management. |
Job objective |
Job type: full-time to duty time: at any time |
Work experience: computer operation ability: general |
Intention position name: engineers, technical person in charge |
Intention industry: building/engineering/construction/installation, real estate development expected salary treatment: 10000 yuan |
Intention post category: civil/civil engineer, construction project management/project manager intention working location: TongLiang, wall mountain, jiangjin |
英文簡(jiǎn)歷表格模板二:
Name: sex don't: male |
Date of birth: - 20 marital status: single |
Education and training experience |
2010.06 to 2010.10 |
Chongqingeasy to know talent school |
Work experience |
Since 2009.01 |
XXX company |
Grass-roots management |
Working location: shapingba district wellhead industrial park |
Enterpriseproperties: private |
Job description: engaged in the first-line managers, finish the company every day early, bottleneck post card, a minute quality inspection team leader 3 * 3 * 3 treatment before the three quality problem TPM maintenance |
Exit/transfer reason:! |
Job objective |
Job type: full-time to duty time: a month |
Work experience: computer operation ability: general |
Intention position name: lower management intention industry: insurance, automobile, spare parts and service |
Intention post category: quality management (QA), safety/health/environment management, insurance claims |
Intention working location: ShaPingBa,Kowloonslope, jiangbei |
英文簡(jiǎn)歷表格模板三:
Basic material |
Name: sex don't: female |
Date of birth: 08 - and marital status: single |
Job situation |
Job type: full-time to duty time: at any time |
Work experience: computer operation ability: |
Intention position name: planner current pay: |
Intention industry: expected salary treatment: negotiable |
Intention post category: the project cost division/preliminary settlement |
Education experience |
2008.09 to 2011.06chongqingpeople's livelihood professional technology institute college engineering cost |
Work experience |
2011.05 eight bridge company planner |
Working location: nanchong enterprise properties: private |
Job description: eight bridge in the company I work in the top of the civil engineering, in this project, I participated in the bar and graphic calculation quantity. |
Exit/transfer reason: |
看過(guò)“英文簡(jiǎn)歷表格模板”的人還看了: